Dirt Town machine payback calculator

Every machine decision in Dirt Town is a race between the price on the shop board and the rate you can turn jobs into credits. This page turns that race into two numbers: how many loads the machine has to finish before it has paid for itself, and how many hours that takes at your own pace.

Net per load
300
Loads to break even
150
Hours at your pace
25.0
Net credits per hour
1,800 credits an hour once the machine is running, before it has paid itself off.

The numbers stay in your browser and nothing is sent anywhere. Diesel is modelled as a flat cost per load, which matches how the game itemises a finished job: a payout line, a diesel line, and an earned total underneath. Long pushes, idling and ferry trips will drift from that flat figure.

What each field means

Machine price is what the shop asks for the machine you are considering, not what you have in the bank. Payout per load is the headline number on a finished job. Diesel per load is the cost line the game subtracts before it shows what you earned; a finished job card shows the gross payout, the diesel spend and an earned total, so read both lines rather than the biggest one. Loads per hour is your pace, not a theoretical maximum: loading, the drive out, tipping and the drive back all count.

How to use the answer

Run the calculator twice when you are choosing between two machines: once with the cheaper machine and its smaller payout, once with the expensive one and the bigger job it unlocks. The machine with the shorter hour count is not automatically the right buy, because a machine that opens a job type you could not touch before changes what every later hour is worth. That second effect is what the best machines buying order walks through.

If the loads-to-break-even figure looks absurd, the problem is usually the job rather than the machine: a short haul with a long queue at the tip will not pay for a bigger truck no matter how many hours you put in. The money guide covers the routes that actually convert diesel into credits, and the gravel hauling route is the one to measure first.

What the calculator leaves out

It does not model repairs, resale value, or the time you spend building the road that makes a route fast in the first place. It also assumes a flat diesel cost per load, while the real spend climbs with long pushes, idling and steep grades. Treat the output as a floor: the machine will take at least this many loads, and usually a few more.

For the physics side of making those loads faster, the road building guide covers grading, drainage and the mistakes that turn a two-minute run into a five-minute one.